View page in desktop
|
Report error
  •   Apple app store icon
  • Google play store icon
Terms of Service
|
Privacy Policy
|
PDPA
|
Site Map
©2004-2026 Sgcarmart, Singapore. All rights reserved.
  • Home
  • Car Articles
  • news
  • news Listings
  • LTA News
  • Longer commutes soon via Circle Line due to tunnel works

    01 Dec 2025

    |

    295 views

    From 17 January to 19 April 2026, tunnel strengthening works could see commuters facing additional waiting times of up to 30 minutes during peak hours.

    If you rely heavily on the Circle Line (CCL) to get to and from work on weekdays, you'll probably want to factor in more travelling time for yourself come January next year.

    The LTA has announced that from 17 January to 19 April 2026, essential tunnel strengthening works along the the two tunnels connecting Mountbatten, Dakota and Paya Lebar stations could see commuters facing additional waiting times of up to 30 minutes during peak hours.

    Shuttle train services are set to run between Paya Lebar and Mountbatten at 10-minute intervals

    The longer commutes are expected because each of the two tunnels running along the three stations will be closed one at a time during the aforementioned period. The tunnel that remains open will then see the deployment of shuttle trains between Paya Lebar and Mountbatten, at intervals of 10 minutes.

    In anticipation of the inconvenience that the strengthening works will cause, the LTA will operate new shuttle bus services during weekday peak periods to bring commuters to unaffected parts of the train network.

    These will commence on 5 January 2026 - approximately two weeks before the tunnel closure - to give commuters some time to familiarise themselves with their new travel routes, with the services to follow the same fare structures as the trains.

    Bus service numberBus service typeService timings Average intervals
    38Shuttle bus service between Paya Lebar and Stadium06:30am to 09:30am, 05:00pm to 08:00pmSix to 10 minutes
    37AOne-way shuttle bus service from Serangoon to Tai Seng, Macpherson and Paya Lebar07:00am to 09:00amThree to five minutes
    37BOne-way shuttle bus service from Tai Seng to Bishan05:30pm to 07:30pmThree to five minutes
    37C One-way shuttle bus service from Tai Seng to Serangoon05:30pm to 07:30pmThree to five minutes 

    In addition to these supplementary services, the LTA is also encouraging commuters to explore routes along other MRT lines during the affected period. 

    Specifically, residents in the North-East who need to travel to the western region of Singapore are encouraged to take the North East Line (NEL) all the way to Outram Park interchange, rather than transfer to the CCL at Serangoon. 

    They are also encouraged to transit via Harbourfront interchange, rather than Serangoon, if they need to travel to one-north, Kent Ridge, or Buona Vista stations. 

    The LTA has shared that the latest tunnel strengthening works are necessary in order to protect the CCL against a phenomenon known as 'tunnel squatting', which could potentially lead to structural defects in the long term if left unaddressed.

    The LTA is encouraging commuters to explore alternative routes for the period 

    Caused by the soft marine clay in which some CCL tunnels are built, the phenomenon is apparently a common one (experienced in places such as Shanghai, Taipei and Busan), with counteractive strengthening works requiring heavy machinery and the deployment of several work teams for the installation of steel plates along the circumference of affected tunnel segments. 

    This, in turn, necessitates longer blocks of engineering hours for the strengthening works to be carried out safely and effectively. In addition to the cities mentioned above, best practices from Barcelona and Lisbon were also studied to map out the impending works along the CCL.

    To further remind commuters of the upcoming service adjustments, the LTA will conduct roadshows and engage affected commuters at selected CCL stations in advance. The authority has also directed commuters to its MyTransport.SG mobile app and social media platforms for more details.

    24.4k

    Tags

    circle line tunnel strengthening works public transport lta

    AllReviewsNewsAdviceFeaturesVideos
    • Home
    • Car Articles
    • news
    • news Listings
    • LTA News

    Longer commutes soon via Circle Line due to tunnel works

    01 Dec 2025

    |

    295 views

    From 17 January to 19 April 2026, tunnel strengthening works could see commuters facing additional waiting times of up to 30 minutes during peak hours.

    If you rely heavily on the Circle Line (CCL) to get to and from work on weekdays, you'll probably want to factor in more travelling time for yourself come January next year.

    The LTA has announced that from 17 January to 19 April 2026, essential tunnel strengthening works along the the two tunnels connecting Mountbatten, Dakota and Paya Lebar stations could see commuters facing additional waiting times of up to 30 minutes during peak hours.

    Shuttle train services are set to run between Paya Lebar and Mountbatten at 10-minute intervals

    The longer commutes are expected because each of the two tunnels running along the three stations will be closed one at a time during the aforementioned period. The tunnel that remains open will then see the deployment of shuttle trains between Paya Lebar and Mountbatten, at intervals of 10 minutes.

    In anticipation of the inconvenience that the strengthening works will cause, the LTA will operate new shuttle bus services during weekday peak periods to bring commuters to unaffected parts of the train network.

    These will commence on 5 January 2026 - approximately two weeks before the tunnel closure - to give commuters some time to familiarise themselves with their new travel routes, with the services to follow the same fare structures as the trains.

    Bus service numberBus service typeService timings Average intervals
    38Shuttle bus service between Paya Lebar and Stadium06:30am to 09:30am, 05:00pm to 08:00pmSix to 10 minutes
    37AOne-way shuttle bus service from Serangoon to Tai Seng, Macpherson and Paya Lebar07:00am to 09:00amThree to five minutes
    37BOne-way shuttle bus service from Tai Seng to Bishan05:30pm to 07:30pmThree to five minutes
    37C One-way shuttle bus service from Tai Seng to Serangoon05:30pm to 07:30pmThree to five minutes 

    In addition to these supplementary services, the LTA is also encouraging commuters to explore routes along other MRT lines during the affected period. 

    Specifically, residents in the North-East who need to travel to the western region of Singapore are encouraged to take the North East Line (NEL) all the way to Outram Park interchange, rather than transfer to the CCL at Serangoon. 

    They are also encouraged to transit via Harbourfront interchange, rather than Serangoon, if they need to travel to one-north, Kent Ridge, or Buona Vista stations. 

    The LTA has shared that the latest tunnel strengthening works are necessary in order to protect the CCL against a phenomenon known as 'tunnel squatting', which could potentially lead to structural defects in the long term if left unaddressed.

    The LTA is encouraging commuters to explore alternative routes for the period 

    Caused by the soft marine clay in which some CCL tunnels are built, the phenomenon is apparently a common one (experienced in places such as Shanghai, Taipei and Busan), with counteractive strengthening works requiring heavy machinery and the deployment of several work teams for the installation of steel plates along the circumference of affected tunnel segments. 

    This, in turn, necessitates longer blocks of engineering hours for the strengthening works to be carried out safely and effectively. In addition to the cities mentioned above, best practices from Barcelona and Lisbon were also studied to map out the impending works along the CCL.

    To further remind commuters of the upcoming service adjustments, the LTA will conduct roadshows and engage affected commuters at selected CCL stations in advance. The authority has also directed commuters to its MyTransport.SG mobile app and social media platforms for more details.

    24.4k

    Tags

    circle line tunnel strengthening works public transport lta

    Newsletter

    Be Notified On The Latest News

    Newsletter

    Be Notified On The Latest News

    Latest COE Prices

    August 2026 | 1st BIDDING
    NEXT TENDER: 19 Aug 2026
    CAT A
    $123,890
    CAT B
    $129,910
    CAT C
    $91,545
    CAT E
    $131,000
    View Full Results

    Latest COE Prices

    August 2026 | 1st BIDDING
    NEXT TENDER: 19 Aug 2026
    CAT A
    $123,890
    CAT B
    $129,910
    CAT C
    $91,545
    CAT E
    $131,000
    View Full Results

    Related Articles

    LTA's CRL3 will connect Jurong Lake District to Gul Circle

    LTA's CRL3 will connect Jurong Lake District to Gul Circle

    Lamborghini gives the Temerario the bespoke treatment

    Lamborghini gives the Temerario the bespoke treatment

    LTA may consider merging Cat A and B COEs in the future

    LTA may consider merging Cat A and B COEs in the future

    COE supply up 0.2% for upcoming quarter

    COE supply up 0.2% for upcoming quarter

    LTA to host special public preview of three new stations

    LTA to host special public preview of three new stations

    LTA gives update for Malaysia-registered taxis entering SG

    LTA gives update for Malaysia-registered taxis entering SG

    LTA awards 2nd civil contract for Changi Southern Corridor

    LTA awards 2nd civil contract for Changi Southern Corridor

    ERP rates to rise come end of June

    ERP rates to rise come end of June

    Related Articles

    LTA's CRL3 will connect Jurong Lake District to Gul Circle

    LTA's CRL3 will connect Jurong Lake District to Gul Circle

    Lamborghini gives the Temerario the bespoke treatment

    Lamborghini gives the Temerario the bespoke treatment

    LTA may consider merging Cat A and B COEs in the future

    LTA may consider merging Cat A and B COEs in the future

    COE supply up 0.2% for upcoming quarter

    COE supply up 0.2% for upcoming quarter

    LTA to host special public preview of three new stations

    LTA to host special public preview of three new stations

    LTA gives update for Malaysia-registered taxis entering SG

    LTA gives update for Malaysia-registered taxis entering SG

    LTA awards 2nd civil contract for Changi Southern Corridor

    LTA awards 2nd civil contract for Changi Southern Corridor

    ERP rates to rise come end of June

    ERP rates to rise come end of June

    You May Also Like

    The BYD Sealion 8 seven-seater SUV arrives in Singapore

    The BYD Sealion 8 seven-seater SUV arrives in Singapore

    New cars are safer: Opt for one when you can

    New cars are safer: Opt for one when you can

    Maxus MIFA 7 Elite: Going big for the little moments

    Maxus MIFA 7 Elite: Going big for the little moments

    Sgcarmart Explores: Bras Basah!

    Sgcarmart Explores: Bras Basah!

    Is parallel import hesitancy growing among car buyers?

    Is parallel import hesitancy growing among car buyers?

    The all new XPENG Mona L03 is one smart coupe SUV

    The all new XPENG Mona L03 is one smart coupe SUV

    Don't get yourself trapped in your high-tech EV

    Don't get yourself trapped in your high-tech EV

    Opinion: Why do we even need green number plates?

    Opinion: Why do we even need green number plates?

    The rise of PHEVs: A closer look at the numbers

    The rise of PHEVs: A closer look at the numbers

    Must-Have Car Accessories Every EV Driver Should Own

    Must-Have Car Accessories Every EV Driver Should Own

    Hongqi Singapore opens its showroom doors

    Hongqi Singapore opens its showroom doors

    Ferrari 849 Testarossa Spider - with the sky included

    Ferrari 849 Testarossa Spider - with the sky included

    Sgcarmart Explores: Holland Village!

    Sgcarmart Explores: Holland Village!

    Tesla launches Model Y L in Singapore, first six-seater here

    Tesla launches Model Y L in Singapore, first six-seater here

    Mercedes-Benz GLB250+ Review

    Mercedes-Benz GLB250+ Review

    5 trends to look out for in 2026

    5 trends to look out for in 2026

    You May Also Like

    The BYD Sealion 8 seven-seater SUV arrives in Singapore

    The BYD Sealion 8 seven-seater SUV arrives in Singapore

    New cars are safer: Opt for one when you can

    New cars are safer: Opt for one when you can

    Maxus MIFA 7 Elite: Going big for the little moments

    Maxus MIFA 7 Elite: Going big for the little moments

    Sgcarmart Explores: Bras Basah!

    Sgcarmart Explores: Bras Basah!

    Is parallel import hesitancy growing among car buyers?

    Is parallel import hesitancy growing among car buyers?

    The all new XPENG Mona L03 is one smart coupe SUV

    The all new XPENG Mona L03 is one smart coupe SUV

    Don't get yourself trapped in your high-tech EV

    Don't get yourself trapped in your high-tech EV

    Opinion: Why do we even need green number plates?

    Opinion: Why do we even need green number plates?

    The rise of PHEVs: A closer look at the numbers

    The rise of PHEVs: A closer look at the numbers

    Must-Have Car Accessories Every EV Driver Should Own

    Must-Have Car Accessories Every EV Driver Should Own

    Hongqi Singapore opens its showroom doors

    Hongqi Singapore opens its showroom doors

    Ferrari 849 Testarossa Spider - with the sky included

    Ferrari 849 Testarossa Spider - with the sky included

    Sgcarmart Explores: Holland Village!

    Sgcarmart Explores: Holland Village!

    Tesla launches Model Y L in Singapore, first six-seater here

    Tesla launches Model Y L in Singapore, first six-seater here

    Mercedes-Benz GLB250+ Review

    Mercedes-Benz GLB250+ Review

    5 trends to look out for in 2026

    5 trends to look out for in 2026