View page in desktop
|
Report error
  •   Apple app store icon
  • Google play store icon
Terms of Service
|
Privacy Policy
|
PDPA
|
Site Map
©2004-2026 Sgcarmart, Singapore. All rights reserved.
  • Home
  • Car Articles
  • news
  • news Listings
  • MRT News
  • Plan for centre to test trains without disrupting services

    25 Apr 2019

    |

    2,391 views

    A new integrated train testing centre, set to be built by 2022, will allow robust testing of new trains without disrupting the operational lines.


    Singapore will build an Integrated Train Testing Centre (ITTC) to put new trains and rail systems through their paces without the risk of disrupting services on operational lines. To be located on a 50ha site at the former Raffles Country Club in Tuas - which was acquired last year for the suspended Kuala Lumpur-Singapore High-Speed Rail project - the centre is expected to be the first of its kind in South-east Asia when it is ready around 2022.

    The IITC will be capable of carrying out robust, round-the-clock testing
    Transport Minister Khaw Boon Wan announced the centre on a visit to rail operator SMRT's new North-South, East-West lines Operations Control Centre (OCC) in Kim Chuan depot yesterday. He said the ITTC will be modelled on similar facilities in Germany, South Korea and Japan. "It will cost us a few hundred million to build," he said. "It is a worthwhile investment."

    He explained that the centre will be able to carry out testing 'robustly, round the clock', and away from the operational lines.

    "This will free up limited engineering hours and reduce the need to close our MRT lines," he noted, referring to the early closures and late openings currently in place. This will enhance the service levels provided to commuters."

    He added that the ITTC will also be able to handle integrated systems testing across all existing and future MRT lines. "By providing the local rail industry with a test bed for understanding the intricacies of new rail systems, the ITTC will deepen our railway operations and maintenance expertise," he said, adding that this would enhance rail reliability.

    The IITC will allow testing without disrupting regular train services
    The minister said that when the centre is ready by 2022 or so, it will be in time to receive new trains and systems for the Circle Line 6 for testing. "By that time, the North-South and East-West lines will be completely renewed too," he said, referring to the upgrading of power systems, trains and track circuits on the two oldest lines.

    In earlier estimates, these three renewal projects were slated to be completed by 2024. Three earlier major asset renewal projects have been completed, namely resignalling, sleeper and power rail replacements.

    As a result, the two lines have become less prone to breakdowns, although train speeds have not yet returned to pre-2011 levels. SMRT's North-South, East-West lines' OCC was previously in Victoria Street, where it operated for 32 years. With its move, Kim Chuan depot is now the nerve centre for the two oldest lines as well as the Circle Line. The new OCC is 50% bigger than the previous one. The operator has also moved its headquarters from North Bridge Road to Paya Lebar Quarter.

    Transport economist Walter Theseira of the Singapore University of Social Sciences said, "Testing is a business. I think it would be good to develop our capacity to do this so that we might be able to provide the service (to other operators) in the region."
    24.4k

    Tags

    mrt mrt testing train testing ittc lta smrt integrated train testing centre

    AllReviewsNewsAdviceFeaturesVideos
    • Home
    • Car Articles
    • news
    • news Listings
    • MRT News

    Plan for centre to test trains without disrupting services

    25 Apr 2019

    |

    2,391 views

    A new integrated train testing centre, set to be built by 2022, will allow robust testing of new trains without disrupting the operational lines.


    Singapore will build an Integrated Train Testing Centre (ITTC) to put new trains and rail systems through their paces without the risk of disrupting services on operational lines. To be located on a 50ha site at the former Raffles Country Club in Tuas - which was acquired last year for the suspended Kuala Lumpur-Singapore High-Speed Rail project - the centre is expected to be the first of its kind in South-east Asia when it is ready around 2022.

    The IITC will be capable of carrying out robust, round-the-clock testing
    Transport Minister Khaw Boon Wan announced the centre on a visit to rail operator SMRT's new North-South, East-West lines Operations Control Centre (OCC) in Kim Chuan depot yesterday. He said the ITTC will be modelled on similar facilities in Germany, South Korea and Japan. "It will cost us a few hundred million to build," he said. "It is a worthwhile investment."

    He explained that the centre will be able to carry out testing 'robustly, round the clock', and away from the operational lines.

    "This will free up limited engineering hours and reduce the need to close our MRT lines," he noted, referring to the early closures and late openings currently in place. This will enhance the service levels provided to commuters."

    He added that the ITTC will also be able to handle integrated systems testing across all existing and future MRT lines. "By providing the local rail industry with a test bed for understanding the intricacies of new rail systems, the ITTC will deepen our railway operations and maintenance expertise," he said, adding that this would enhance rail reliability.

    The IITC will allow testing without disrupting regular train services
    The minister said that when the centre is ready by 2022 or so, it will be in time to receive new trains and systems for the Circle Line 6 for testing. "By that time, the North-South and East-West lines will be completely renewed too," he said, referring to the upgrading of power systems, trains and track circuits on the two oldest lines.

    In earlier estimates, these three renewal projects were slated to be completed by 2024. Three earlier major asset renewal projects have been completed, namely resignalling, sleeper and power rail replacements.

    As a result, the two lines have become less prone to breakdowns, although train speeds have not yet returned to pre-2011 levels. SMRT's North-South, East-West lines' OCC was previously in Victoria Street, where it operated for 32 years. With its move, Kim Chuan depot is now the nerve centre for the two oldest lines as well as the Circle Line. The new OCC is 50% bigger than the previous one. The operator has also moved its headquarters from North Bridge Road to Paya Lebar Quarter.

    Transport economist Walter Theseira of the Singapore University of Social Sciences said, "Testing is a business. I think it would be good to develop our capacity to do this so that we might be able to provide the service (to other operators) in the region."
    24.4k

    Tags

    mrt mrt testing train testing ittc lta smrt integrated train testing centre

    Newsletter

    Be Notified On The Latest News

    Newsletter

    Be Notified On The Latest News

    Related Articles

    LTA to host special public preview of three new stations

    LTA to host special public preview of three new stations

    Catch your free MRT ride between three Circle Line stations!

    Catch your free MRT ride between three Circle Line stations!

    LTA to build new MRT station on North-South Line

    LTA to build new MRT station on North-South Line

    LTA to spruce up MRT stations for its 30th anniversary

    LTA to spruce up MRT stations for its 30th anniversary

    Public transport fares to increase by up to 5%

    Public transport fares to increase by up to 5%

    LTA taskforce appoints Independent Advisory Panel

    LTA taskforce appoints Independent Advisory Panel

    LTA to close Simei and Tanah Merah MRT stations for 10 days

    LTA to close Simei and Tanah Merah MRT stations for 10 days

    LTA sets up taskforce to address rail reliability in SG

    LTA sets up taskforce to address rail reliability in SG

    Related Articles

    LTA to host special public preview of three new stations

    LTA to host special public preview of three new stations

    Catch your free MRT ride between three Circle Line stations!

    Catch your free MRT ride between three Circle Line stations!

    LTA to build new MRT station on North-South Line

    LTA to build new MRT station on North-South Line

    LTA to spruce up MRT stations for its 30th anniversary

    LTA to spruce up MRT stations for its 30th anniversary

    Public transport fares to increase by up to 5%

    Public transport fares to increase by up to 5%

    LTA taskforce appoints Independent Advisory Panel

    LTA taskforce appoints Independent Advisory Panel

    LTA to close Simei and Tanah Merah MRT stations for 10 days

    LTA to close Simei and Tanah Merah MRT stations for 10 days

    LTA sets up taskforce to address rail reliability in SG

    LTA sets up taskforce to address rail reliability in SG

    You May Also Like

    Get your next rental from AKA Car Rental

    Get your next rental from AKA Car Rental

    Recommended Fuel-Saving & Eco-Friendly Tyres for Daily Drive

    Recommended Fuel-Saving & Eco-Friendly Tyres for Daily Drive

    XPENG's Munich moment: The importance of the Mona L03

    XPENG's Munich moment: The importance of the Mona L03

    Dunlop's new tyres for an electrified world

    Dunlop's new tyres for an electrified world

    BYD Seal 6 Plug-in Hybrid Review

    BYD Seal 6 Plug-in Hybrid Review

    The 5 main things you must know about the XPENG L03

    The 5 main things you must know about the XPENG L03

    A first look at the Sitrak Light eTruck!

    A first look at the Sitrak Light eTruck!

    The new Pirelli Cinturato Rosso with Seal Inside Tech!

    The new Pirelli Cinturato Rosso with Seal Inside Tech!

    You May Also Like

    Get your next rental from AKA Car Rental

    Get your next rental from AKA Car Rental

    Recommended Fuel-Saving & Eco-Friendly Tyres for Daily Drive

    Recommended Fuel-Saving & Eco-Friendly Tyres for Daily Drive

    XPENG's Munich moment: The importance of the Mona L03

    XPENG's Munich moment: The importance of the Mona L03

    Dunlop's new tyres for an electrified world

    Dunlop's new tyres for an electrified world

    BYD Seal 6 Plug-in Hybrid Review

    BYD Seal 6 Plug-in Hybrid Review

    The 5 main things you must know about the XPENG L03

    The 5 main things you must know about the XPENG L03

    A first look at the Sitrak Light eTruck!

    A first look at the Sitrak Light eTruck!

    The new Pirelli Cinturato Rosso with Seal Inside Tech!

    The new Pirelli Cinturato Rosso with Seal Inside Tech!

    Latest COE Prices

    July 2026 | 2nd BIDDING
    NEXT TENDER: 05 Aug 2026
    CAT A
    $126,000
    CAT B
    $129,890
    CAT C
    $93,889
    CAT E
    $129,971
    View Full Results

    Latest COE Prices

    July 2026 | 2nd BIDDING
    NEXT TENDER: 05 Aug 2026
    CAT A
    $126,000
    CAT B
    $129,890
    CAT C
    $93,889
    CAT E
    $129,971
    View Full Results