From 1 April 2027, all newly registered motorcycles will come with ABS, while existing motorcycles without ABS do not need to be retrofitted with it.
LTA has commenced Phase One of its P2P industry structure and regulatory framework review, with Phase Two projected to commence in March 2025.
Train services have resumed on the East-West Line this morning following the replacement of additional rail segments.
The LTA has announced that there will be train services from Jurong East to Buona Vista stations for the rest of 30 September 2024.
LTA states that train shuttle service will only run every 20 minutes between Jurong East and Buona Vista stations by 27 September 2024.
LTA has called a tender to appoint a contractor for the addition and alteration works, which are expected to begin in 2025.
This last leg centred on renewals and upgrades to the track circuits, power supply and NSEWL train fleet, to pre-emptively detect and address faults.
Modern design aside, the Leng Kee space is also part of a new 'Omnichannel' platform that brings in digital touchpoints to enhance the customer journey.
The new Lotus PR centre will be headed by James Andrew who has been recently appointed as Lotus Chief Brand Officer.
Aston Martin reengineers itself, taking on a new identity and updating its iconic hand-enamelled wings, which will feature on its next generation supercars.
The 2023 model remains mostly unchanged apart from a few aesthetic upgrades that have arrived to spruce up your Wrangler for the coming year.
The first of a total of 106 new trains for the East-West and North-South MRT lines have arrived in Singapore, set to enter service later in 2022.
The F-PACE SVR is a pinnacle of the performance SUV range, quicker off the line, more agile and dynamic, and with a more luxurious and refined interior finish.
A power fault on the North-South and East-West lines during the evening rush hour on 14 October 2020 has resulted in delays for commuters.
A train fault extended travelling time on the North-South Line by 15 minutes on the morning of 14 August 2020, the second rail glitch in the week.
From October to December, some East-West Line stations will close early to facilitate maintenance works, and shuttle buses will be provided to plug the gap.
Eastbound trains on the East-West MRT line skipped Dover station on Wednesday morning, 3 July, because of a faulty platform screen door.
Grab has announced a revamped driver app that features four new components to help its driver-partners earn more and save more.
Commuters taking the North-South and East-West Line should expect longer train service intervals and early closures at selected stations from April to June.
A track fault has once again rendered trains crawling along the East-West Line on Friday morning, 15 March.