View page in desktop
|
Report error
  •   Apple app store icon
  • Google play store icon
Terms of Service
|
Privacy Policy
|
PDPA
|
Site Map
©2004-2026 Sgcarmart, Singapore. All rights reserved.

35 bishan articles

  • New cycling paths open in Ang Mo Kio, Bishan, and Toa Payoh

    New cycling paths open in Ang Mo Kio, Bishan, and Toa Payoh

    A total of 14.5km of new cycling paths stretching across the towns of Ang Mo Kio, Bishan, and Toa Payoh have been officially opened.

    LTA News
  • SMRT worker dies after suffering severe injuries at work

    SMRT worker dies after suffering severe injuries at work

    A 30-year old working with transport operator SMRT died on 23 March 2020 after suffering severe injuries in the course of his work at Bishan Depot.

    MRT News
  • SMRT to face $1.9m in fines for deaths of two trainees and flooding incident

    SMRT to face $1.9m in fines for deaths of two trainees and flooding incident

    Rail operator SMRT faces fines totalling $1.9 million for the accident, which resulted in the death of two SMRT trainees and the flooding incident at Bishan.

    MRT News
  • Flood mitigation measures to be introduced at four locations on East-West Line

    Flood mitigation measures to be introduced at four locations on East-West Line

    SMRT will be introducing flood mitigation measures at four locations on the East-West Line to prevent a repeat of October's flooding incident.

    MRT News
  • Parliament: SMRT spent $2 million on repairs, replacements after Bishan flooding

    Parliament: SMRT spent $2 million on repairs, replacements after Bishan flooding

    Transport Minister Khaw Boon Wan says that SMRT spent about $2 million on repairs and rail equipment replacements after the Bishan flooding last October.

    MRT News
  • MRT tunnel flooding entirely preventable, says LTA report

    MRT tunnel flooding entirely preventable, says LTA report

    The Land Transport Authority said yesterday that the flooding of the Bishan MRT station tunnel on 7th October was 'entirely preventable'.

    MRT News
  • PUB, LTA form committee to look into tunnel flood prevention

    PUB, LTA form committee to look into tunnel flood prevention

    The Land Transport Authority has formed a standing committee with water agency PUB to look into the prevention of floods in tunnels.

    MRT News
  • SMRT's legal options depend on staff contracts

    SMRT's legal options depend on staff contracts

    SMRT's legal options against its employees linked to last month's MRT tunnel flooding will depend on the terms of their staff contracts.

    MRT News
  • Debris caused short circuit, resulting in electrical arcing

    Debris caused short circuit, resulting in electrical arcing

    Train Captain Choo Ah Heng, who reported the Bishan station tunnel flooding on 7th October, also spotted electrical arcing further down the North-South Line.

    MRT News
  • Khaw outlines plans to prevent flooding of MRT tunnels again

    Khaw outlines plans to prevent flooding of MRT tunnels again

    Transport Minister Khaw Boon Wan made a statement in Parliament yesterday regarding his plans to prevent the flooding of MRT tunnels in the future.

    MRT News
  • Faulty pumps detected near Kembangan, Lavender stations

    Faulty pumps detected near Kembangan, Lavender stations

    Faulty water discharge pumps have been found near Kembangan and Lavender stations, following the flooding incident at Bishan station last month.

    MRT News
  • SMRT completes flooding investigations involving six staff and seven managers

    SMRT completes flooding investigations involving six staff and seven managers

    SMRT will be taking disciplinary action against six staff from the Building and Facilities Maintenance group while seven managers will face inquiries.

    MRT News
  • Slower service on North-South Line to last till end of Wednesday

    Slower service on North-South Line to last till end of Wednesday

    The slower service the North-South Line, which was caused by a track fault between Ang Mo Kio and Bishan, is expected to last till the end of today.

    MRT News
  • Slower city-bound trains on North-South Line due to track fault: SMRT

    Slower city-bound trains on North-South Line due to track fault: SMRT

    City-bound trains on the North-South Line are running slower due to a track fault along a 150m stretch between Ang Mo Kio and Bishan stations.

    MRT News
  • Water pumping system malfunction at Bishan MRT station caused tunnel to flood

    Water pumping system malfunction at Bishan MRT station caused tunnel to flood

    A malfunction in the water pumping system at Bishan MRT station caused rainwater to collect in the MRT tunnel, resulting in weekend train service disruption.

    MRT News
  • Train fault on North-South Line cleared after delay from Yishun to Bishan

    Train fault on North-South Line cleared after delay from Yishun to Bishan

    The Straits Times understands the train had stalled because of a power-related fault, and had to be pushed out by another train.

    Other News
  • Braddell Flyover's completion delayed again

    Braddell Flyover's completion delayed again

    The completion of Braddell Flyover was originally slated for 2015 but has been delayed to the first quarter of next year; the second time since 2012.

    LTA News
  • Delays on Circle Line on Tuesday morning due to track fault

    Delays on Circle Line on Tuesday morning due to track fault

    The Circle Line was delayed again on Tuesday, 20th September, morning due to a track fault; this comes after a series of delays not too long ago.

    Other News
  • Morning rush hour delays on Circle Line for third day

    Morning rush hour delays on Circle Line for third day

    Morning rush hour woes on Wednesday, the 31st of August, brought the Circle Line into its third day of disrupted service since Monday.

    Other News
  • SMRT partners local energy provider to use solar power for Bishan Depot

    SMRT partners local energy provider to use solar power for Bishan Depot

    Singapore's first and largest rail depot, the Bishan Depot, is set to run on solar power by the end of October 2016.

    Other News
Newsletter

Be Notified On The Latest News

AllReviewsNewsAdviceFeaturesVideos

35 bishan articles

  • New cycling paths open in Ang Mo Kio, Bishan, and Toa Payoh

    New cycling paths open in Ang Mo Kio, Bishan, and Toa Payoh

    A total of 14.5km of new cycling paths stretching across the towns of Ang Mo Kio, Bishan, and Toa Payoh have been officially opened.

    LTA News
  • SMRT worker dies after suffering severe injuries at work

    SMRT worker dies after suffering severe injuries at work

    A 30-year old working with transport operator SMRT died on 23 March 2020 after suffering severe injuries in the course of his work at Bishan Depot.

    MRT News
  • SMRT to face $1.9m in fines for deaths of two trainees and flooding incident

    SMRT to face $1.9m in fines for deaths of two trainees and flooding incident

    Rail operator SMRT faces fines totalling $1.9 million for the accident, which resulted in the death of two SMRT trainees and the flooding incident at Bishan.

    MRT News
  • Flood mitigation measures to be introduced at four locations on East-West Line

    Flood mitigation measures to be introduced at four locations on East-West Line

    SMRT will be introducing flood mitigation measures at four locations on the East-West Line to prevent a repeat of October's flooding incident.

    MRT News
  • Parliament: SMRT spent $2 million on repairs, replacements after Bishan flooding

    Parliament: SMRT spent $2 million on repairs, replacements after Bishan flooding

    Transport Minister Khaw Boon Wan says that SMRT spent about $2 million on repairs and rail equipment replacements after the Bishan flooding last October.

    MRT News
  • MRT tunnel flooding entirely preventable, says LTA report

    MRT tunnel flooding entirely preventable, says LTA report

    The Land Transport Authority said yesterday that the flooding of the Bishan MRT station tunnel on 7th October was 'entirely preventable'.

    MRT News
  • PUB, LTA form committee to look into tunnel flood prevention

    PUB, LTA form committee to look into tunnel flood prevention

    The Land Transport Authority has formed a standing committee with water agency PUB to look into the prevention of floods in tunnels.

    MRT News
  • SMRT's legal options depend on staff contracts

    SMRT's legal options depend on staff contracts

    SMRT's legal options against its employees linked to last month's MRT tunnel flooding will depend on the terms of their staff contracts.

    MRT News
  • Debris caused short circuit, resulting in electrical arcing

    Debris caused short circuit, resulting in electrical arcing

    Train Captain Choo Ah Heng, who reported the Bishan station tunnel flooding on 7th October, also spotted electrical arcing further down the North-South Line.

    MRT News
  • Khaw outlines plans to prevent flooding of MRT tunnels again

    Khaw outlines plans to prevent flooding of MRT tunnels again

    Transport Minister Khaw Boon Wan made a statement in Parliament yesterday regarding his plans to prevent the flooding of MRT tunnels in the future.

    MRT News
  • Faulty pumps detected near Kembangan, Lavender stations

    Faulty pumps detected near Kembangan, Lavender stations

    Faulty water discharge pumps have been found near Kembangan and Lavender stations, following the flooding incident at Bishan station last month.

    MRT News
  • SMRT completes flooding investigations involving six staff and seven managers

    SMRT completes flooding investigations involving six staff and seven managers

    SMRT will be taking disciplinary action against six staff from the Building and Facilities Maintenance group while seven managers will face inquiries.

    MRT News
  • Slower service on North-South Line to last till end of Wednesday

    Slower service on North-South Line to last till end of Wednesday

    The slower service the North-South Line, which was caused by a track fault between Ang Mo Kio and Bishan, is expected to last till the end of today.

    MRT News
  • Slower city-bound trains on North-South Line due to track fault: SMRT

    Slower city-bound trains on North-South Line due to track fault: SMRT

    City-bound trains on the North-South Line are running slower due to a track fault along a 150m stretch between Ang Mo Kio and Bishan stations.

    MRT News
  • Water pumping system malfunction at Bishan MRT station caused tunnel to flood

    Water pumping system malfunction at Bishan MRT station caused tunnel to flood

    A malfunction in the water pumping system at Bishan MRT station caused rainwater to collect in the MRT tunnel, resulting in weekend train service disruption.

    MRT News
  • Train fault on North-South Line cleared after delay from Yishun to Bishan

    Train fault on North-South Line cleared after delay from Yishun to Bishan

    The Straits Times understands the train had stalled because of a power-related fault, and had to be pushed out by another train.

    Other News
  • Braddell Flyover's completion delayed again

    Braddell Flyover's completion delayed again

    The completion of Braddell Flyover was originally slated for 2015 but has been delayed to the first quarter of next year; the second time since 2012.

    LTA News
  • Delays on Circle Line on Tuesday morning due to track fault

    Delays on Circle Line on Tuesday morning due to track fault

    The Circle Line was delayed again on Tuesday, 20th September, morning due to a track fault; this comes after a series of delays not too long ago.

    Other News
  • Morning rush hour delays on Circle Line for third day

    Morning rush hour delays on Circle Line for third day

    Morning rush hour woes on Wednesday, the 31st of August, brought the Circle Line into its third day of disrupted service since Monday.

    Other News
  • SMRT partners local energy provider to use solar power for Bishan Depot

    SMRT partners local energy provider to use solar power for Bishan Depot

    Singapore's first and largest rail depot, the Bishan Depot, is set to run on solar power by the end of October 2016.

    Other News
Newsletter

Be Notified On The Latest News