View page in desktop
|
Report error
  •   Apple app store icon
  • Google play store icon
Terms of Service
|
Privacy Policy
|
PDPA
|
Site Map
©2004-2026 Sgcarmart, Singapore. All rights reserved.

25 changi east articles

  • LTA awards 2nd civil contract for Changi Southern Corridor

    LTA awards 2nd civil contract for Changi Southern Corridor

    This contributes towards the enhancements of road networks along Xilin Avenue, East Coast Parkway, and Tanah Merah Coast Road, and will start in Q3 2026.

    LTA News
  • New TEL interchange to connect Terminal 5 and city centre

    New TEL interchange to connect Terminal 5 and city centre

    The new TE32/CR1 Changi Terminal 5 interchange will connect the airport terminal directly to the city centre and other major hubs.

    LTA News
  • TEL extension to connect city centre to Changi Airport

    TEL extension to connect city centre to Changi Airport

    LTA has called a tender to appoint a contractor for the addition and alteration works, which are expected to begin in 2025.

    LTA News
  • Watch out for these speed camera hotspots in Singapore!

    Watch out for these speed camera hotspots in Singapore!

    Driving in Singapore is already expensive enough, let's not add to our expenditure with unnecessary speeding tickets.

    Miscellaneous Advice
  • Work to complete collapsed TPE-PIE viaduct to begin next year

    Work to complete collapsed TPE-PIE viaduct to begin next year

    Work on the viaduct in Changi, originally scheduled to be completed in 2020, was suspended after it collapsed in July last year, killing one worker.

    LTA News
  • LTA and viaduct builder mutually terminate contract

    LTA and viaduct builder mutually terminate contract

    The decision came barely two months after the construction company and five people were charged in court over their role in the collapse.

    Other News
  • Uncompleted sections of collapsed PIE viaduct to be demolished as precaution

    Uncompleted sections of collapsed PIE viaduct to be demolished as precaution

    The Land Transport Authority has decided to demolish the crossheads on the uncompleted sections of the PIE viaduct, which collapsed last year.

    Other News
  • PIE viaduct collapse: Two more individuals to face charges

    PIE viaduct collapse: Two more individuals to face charges

    Two more individuals, Dr. Robert Arianto Tjandra and Mr. Leong Sow Hon, will face charges for the collapse of the PIE viaduct that killed one last year.

    Accidents News
  • Construction firm and employees to face charges over collapsed viaduct

    Construction firm and employees to face charges over collapsed viaduct

    Three people and a main contractor will be charged in court next week over the collapse of an incomplete viaduct on Upper Changi Road East earlier this year.

    Accidents News
  • Work resumes at collapsed PIE viaduct project

    Work resumes at collapsed PIE viaduct project

    Work has resumed at the site of the PIE viaduct, which collapsed on 14th July 2017, killed one worker and injured 10 others.

    Other News
  • Probe into last July's viaduct collapse not completed yet

    Probe into last July's viaduct collapse not completed yet

    Investigations into the collapse of the road viaduct at Upper Changi Road East six months ago, which killed one and injured 10 others, have not been completed.

    Other News
  • Towing services kept busy in Monday's floods

    Towing services kept busy in Monday's floods

    Towing services have been kept busy by the flash floods that occurred on Monday morning in the eastern parts of Singapore.

    Other News
  • Track signalling fault recurs on East-West Line on Tuesday morning

    Track signalling fault recurs on East-West Line on Tuesday morning

    In a tweet at 5:49am, SMRT asked commuters to add 30 minutes train travel time between Changi Airport and Tanah Merah stations.

    MRT News
  • Changi Airport's Terminal 5 likely to be served by two MRT lines

    Changi Airport's Terminal 5 likely to be served by two MRT lines

    Many other Asian airports like those in Bangkok, Tokyo, Shanghai and Hong Kong, provide a rail option - in some cases, an express service - for travellers.

    Other News
  • $325 million contract to build new platform at Tanah Merah station

    $325 million contract to build new platform at Tanah Merah station

    The Land Transport Authority has awarded the contract to build a new platform at Tanah Merah MRT station and viaducts for about $325 million.

    LTA News
  • Thomson-East Coast MRT line could extend to Changi airport

    Thomson-East Coast MRT line could extend to Changi airport

    If plans for an extension to Changi Airport materialise, there will be a direct train on the Thomson-East Coast MRT line from the airport to the city.

    Other News
  • Thomson-East Coast Line could be extended to connect to Changi Airport

    Thomson-East Coast Line could be extended to connect to Changi Airport

    The Thomson-East Coast Line (TEL), currently being constructed, could be extended to connect to the Changi Airport MRT station, as well as upcoming Terminal 5.

    Other News
  • Large-scale road works needed to develop Changi Airport Terminal 5

    Large-scale road works needed to develop Changi Airport Terminal 5

    New roads and wider expressways are being planned to cater for increased traffic volumes when Changi East is fully developed.

    Other News
  • LTA has announced plans to construct a new train and bus depot in Changi

    LTA has announced plans to construct a new train and bus depot in Changi

    LTA has announced a new world's first four-in-one train and bus depot, which could house as much as 220 trains and 550 buses.

    LTA News
  • Parts of tipper truck gets stuck in sink hole incident in Upper Changi

    Parts of tipper truck gets stuck in sink hole incident in Upper Changi

    A tipper truck transporting soil collapsed into a two metre wide sink hole yesterday morning, along a section of Upper Changi Road East.

    Other News
Newsletter

Be Notified On The Latest News

AllReviewsNewsAdviceFeaturesVideos

25 changi east articles

  • LTA awards 2nd civil contract for Changi Southern Corridor

    LTA awards 2nd civil contract for Changi Southern Corridor

    This contributes towards the enhancements of road networks along Xilin Avenue, East Coast Parkway, and Tanah Merah Coast Road, and will start in Q3 2026.

    LTA News
  • New TEL interchange to connect Terminal 5 and city centre

    New TEL interchange to connect Terminal 5 and city centre

    The new TE32/CR1 Changi Terminal 5 interchange will connect the airport terminal directly to the city centre and other major hubs.

    LTA News
  • TEL extension to connect city centre to Changi Airport

    TEL extension to connect city centre to Changi Airport

    LTA has called a tender to appoint a contractor for the addition and alteration works, which are expected to begin in 2025.

    LTA News
  • Watch out for these speed camera hotspots in Singapore!

    Watch out for these speed camera hotspots in Singapore!

    Driving in Singapore is already expensive enough, let's not add to our expenditure with unnecessary speeding tickets.

    Miscellaneous Advice
  • Work to complete collapsed TPE-PIE viaduct to begin next year

    Work to complete collapsed TPE-PIE viaduct to begin next year

    Work on the viaduct in Changi, originally scheduled to be completed in 2020, was suspended after it collapsed in July last year, killing one worker.

    LTA News
  • LTA and viaduct builder mutually terminate contract

    LTA and viaduct builder mutually terminate contract

    The decision came barely two months after the construction company and five people were charged in court over their role in the collapse.

    Other News
  • Uncompleted sections of collapsed PIE viaduct to be demolished as precaution

    Uncompleted sections of collapsed PIE viaduct to be demolished as precaution

    The Land Transport Authority has decided to demolish the crossheads on the uncompleted sections of the PIE viaduct, which collapsed last year.

    Other News
  • PIE viaduct collapse: Two more individuals to face charges

    PIE viaduct collapse: Two more individuals to face charges

    Two more individuals, Dr. Robert Arianto Tjandra and Mr. Leong Sow Hon, will face charges for the collapse of the PIE viaduct that killed one last year.

    Accidents News
  • Construction firm and employees to face charges over collapsed viaduct

    Construction firm and employees to face charges over collapsed viaduct

    Three people and a main contractor will be charged in court next week over the collapse of an incomplete viaduct on Upper Changi Road East earlier this year.

    Accidents News
  • Work resumes at collapsed PIE viaduct project

    Work resumes at collapsed PIE viaduct project

    Work has resumed at the site of the PIE viaduct, which collapsed on 14th July 2017, killed one worker and injured 10 others.

    Other News
  • Probe into last July's viaduct collapse not completed yet

    Probe into last July's viaduct collapse not completed yet

    Investigations into the collapse of the road viaduct at Upper Changi Road East six months ago, which killed one and injured 10 others, have not been completed.

    Other News
  • Towing services kept busy in Monday's floods

    Towing services kept busy in Monday's floods

    Towing services have been kept busy by the flash floods that occurred on Monday morning in the eastern parts of Singapore.

    Other News
  • Track signalling fault recurs on East-West Line on Tuesday morning

    Track signalling fault recurs on East-West Line on Tuesday morning

    In a tweet at 5:49am, SMRT asked commuters to add 30 minutes train travel time between Changi Airport and Tanah Merah stations.

    MRT News
  • Changi Airport's Terminal 5 likely to be served by two MRT lines

    Changi Airport's Terminal 5 likely to be served by two MRT lines

    Many other Asian airports like those in Bangkok, Tokyo, Shanghai and Hong Kong, provide a rail option - in some cases, an express service - for travellers.

    Other News
  • $325 million contract to build new platform at Tanah Merah station

    $325 million contract to build new platform at Tanah Merah station

    The Land Transport Authority has awarded the contract to build a new platform at Tanah Merah MRT station and viaducts for about $325 million.

    LTA News
  • Thomson-East Coast MRT line could extend to Changi airport

    Thomson-East Coast MRT line could extend to Changi airport

    If plans for an extension to Changi Airport materialise, there will be a direct train on the Thomson-East Coast MRT line from the airport to the city.

    Other News
  • Thomson-East Coast Line could be extended to connect to Changi Airport

    Thomson-East Coast Line could be extended to connect to Changi Airport

    The Thomson-East Coast Line (TEL), currently being constructed, could be extended to connect to the Changi Airport MRT station, as well as upcoming Terminal 5.

    Other News
  • Large-scale road works needed to develop Changi Airport Terminal 5

    Large-scale road works needed to develop Changi Airport Terminal 5

    New roads and wider expressways are being planned to cater for increased traffic volumes when Changi East is fully developed.

    Other News
  • LTA has announced plans to construct a new train and bus depot in Changi

    LTA has announced plans to construct a new train and bus depot in Changi

    LTA has announced a new world's first four-in-one train and bus depot, which could house as much as 220 trains and 550 buses.

    LTA News
  • Parts of tipper truck gets stuck in sink hole incident in Upper Changi

    Parts of tipper truck gets stuck in sink hole incident in Upper Changi

    A tipper truck transporting soil collapsed into a two metre wide sink hole yesterday morning, along a section of Upper Changi Road East.

    Other News
Newsletter

Be Notified On The Latest News