The design and construction of the new NS3A station, which will be between Choa Chu Kang and Bukit Gombak MRT, will be handled by Obayashi Corporation.
We drove the new Audi A5 on a road trip in Malaysia and thoroughly enjoyed the mix of smooth expressways and twisty back roads.
Audi invited us on a fuel economy challenge to Ipoh, and we decided to leave nothing on the table.
The new Hume MRT station will serve residents staying along Hume Avenue, with sheltered linkways enhancing first-and-last mile connectivity.
The new DTL2e will shorten travel times for those travelling to and from the north and north-western parts of Singapore, and is projected to open by 2035.
The authorities also addressed the possibility of a new category for private-hire cars, cautioning that doing so would not necessarily alleviate COE prices.
This last leg centred on renewals and upgrades to the track circuits, power supply and NSEWL train fleet, to pre-emptively detect and address faults.
The LTA states that the new station will help commuters headed downtown or to the Jurong Lake District save up to 15 minutes of travel time.
The endless expressways aren't all that Malaysia has to offer drivers, as I've recently found out. There are fun twisty roads to explore as well!
A Nissan Ariya will be travelling from the North Pole to the South in an effort to highlight the importance of electric vehicles in fighting climate change.
Effortless to drive, and of course, surprisingly easy to recharge - the Audi e-tron family impresses us on our first post-pandemic road trip from KL.
Launched by one of Singapore's leading energy providers, Go by City Energy is making a grand entrance with a wide, border-transcending network of chargers.
The first of a total of 106 new trains for the East-West and North-South MRT lines have arrived in Singapore, set to enter service later in 2022.
A train fault occured on the North-South Line late on Friday night, 8 January 2021, but it was cleared and services were progressively restored before midnight.
A power fault on the North-South and East-West lines during the evening rush hour on 14 October 2020 has resulted in delays for commuters.
Those living and working nearby the construction sites of the North-South Corridor have been resigned to jams and noise, but look forward to its completion.
The LTA has purchased another 40 new trains from Bombardier Transportation as part of the long-term fleet renewal programme for the NSL and EWL.
A train fault extended travelling time on the North-South Line by 15 minutes on the morning of 14 August 2020, the second rail glitch in the week.
The early station closures are to allow for the installation of 22kV power cables as part of the renewal of the power supply system.
A track fault near Braddell MRT station was slowing down train service on the North-South Line towards the city on 17 March 2020.