View page in desktop
|
Report error
  •   Apple app store icon
  • Google play store icon
Terms of Service
|
Privacy Policy
|
PDPA
|
Site Map
©2004-2026 Sgcarmart, Singapore. All rights reserved.
  • Home
  • Car Articles
  • news
  • news Listings
  • LTA News
  • LTA to open realigned Lim Chu Kang road

    26 May 2025

    |

    616 views

    The existing Lim Chu Kang road will also be decommissioned and closed to facilitate remaining road works, which is scheduled for completion in Q3 2025.

    LTA has announced that the realigned Lim Chu Kang road will open on 8 June 2025 at 12:30am.

    Spanning about eight kilometres, the realigned road will comprise a dual three-lane carriageway from Jalan Bahar to the new junction with the Old Choa Chu Kang road, before transitioning into a dual two-lane carriageway.

    This road will also be extended to form a new signalised T-junction with Jalan Bahar, which will facilitate the expansion of Tengah Air Base.

    To facilitate the remaining road works, the existing Lim Chu Kang road will be decommissioned and closed on the same aforementioned date and timing. These works, scheduled for completion in Q3 2025, include reconfiguring the junction between Jalan Bahar and Old Choa Chu Kang road into a signalised T-junction, as well as removing parts of the closed sections of Jalan Bahar and Lim Chu Kang road.

    There will also be new footpaths along both sides of the realigned Lim Chu Kang road, as well as eight new bus stops for improved connectivity. Six bus stops along Jalan Bahar and Old Choa Chu Kang road will also be relocated to better serve commuters.

    New informational and directional traffic signs will be put up on-site to guide motorists using the realigned roads. Road users are advised to plan their journeys in advance and follow traffic signs on site. Public bus commuters can refer to the posters on the bus route changes, which will be displayed at the relevant bus interchanges, affected bus stops and on the bus operator's social media platforms.

    24.4k

    Tags

    lta lim chu kang road jalan bahar old choa chu kang road tengah air base

    AllReviewsNewsAdviceFeaturesVideos
    • Home
    • Car Articles
    • news
    • news Listings
    • LTA News

    LTA to open realigned Lim Chu Kang road

    26 May 2025

    |

    616 views

    The existing Lim Chu Kang road will also be decommissioned and closed to facilitate remaining road works, which is scheduled for completion in Q3 2025.

    LTA has announced that the realigned Lim Chu Kang road will open on 8 June 2025 at 12:30am.

    Spanning about eight kilometres, the realigned road will comprise a dual three-lane carriageway from Jalan Bahar to the new junction with the Old Choa Chu Kang road, before transitioning into a dual two-lane carriageway.

    This road will also be extended to form a new signalised T-junction with Jalan Bahar, which will facilitate the expansion of Tengah Air Base.

    To facilitate the remaining road works, the existing Lim Chu Kang road will be decommissioned and closed on the same aforementioned date and timing. These works, scheduled for completion in Q3 2025, include reconfiguring the junction between Jalan Bahar and Old Choa Chu Kang road into a signalised T-junction, as well as removing parts of the closed sections of Jalan Bahar and Lim Chu Kang road.

    There will also be new footpaths along both sides of the realigned Lim Chu Kang road, as well as eight new bus stops for improved connectivity. Six bus stops along Jalan Bahar and Old Choa Chu Kang road will also be relocated to better serve commuters.

    New informational and directional traffic signs will be put up on-site to guide motorists using the realigned roads. Road users are advised to plan their journeys in advance and follow traffic signs on site. Public bus commuters can refer to the posters on the bus route changes, which will be displayed at the relevant bus interchanges, affected bus stops and on the bus operator's social media platforms.

    24.4k

    Tags

    lta lim chu kang road jalan bahar old choa chu kang road tengah air base

    Newsletter

    Be Notified On The Latest News

    Newsletter

    Be Notified On The Latest News

    Latest COE Prices

    August 2026 | 1st BIDDING
    NEXT TENDER: 19 Aug 2026
    CAT A
    $123,890
    CAT B
    $129,910
    CAT C
    $91,545
    CAT E
    $131,000
    View Full Results

    Latest COE Prices

    August 2026 | 1st BIDDING
    NEXT TENDER: 19 Aug 2026
    CAT A
    $123,890
    CAT B
    $129,910
    CAT C
    $91,545
    CAT E
    $131,000
    View Full Results

    You May Also Like

    Get your next rental from AKA Car Rental

    Get your next rental from AKA Car Rental

    New to driving? Here's how to become a better driver

    New to driving? Here's how to become a better driver

    Sgcarmart Explores: 2026 National Day Edition!

    Sgcarmart Explores: 2026 National Day Edition!

    Dunlop's new tyres for an electrified world

    Dunlop's new tyres for an electrified world

    Corvette Stingray Review

    Corvette Stingray Review

    Omoda & Jaecoo is forging ahead with its Super AI cockpit

    Omoda & Jaecoo is forging ahead with its Super AI cockpit

    A first look at the Sitrak Light eTruck!

    A first look at the Sitrak Light eTruck!

    The new Pirelli Cinturato Rosso with Seal Inside Tech!

    The new Pirelli Cinturato Rosso with Seal Inside Tech!

    You May Also Like

    Get your next rental from AKA Car Rental

    Get your next rental from AKA Car Rental

    New to driving? Here's how to become a better driver

    New to driving? Here's how to become a better driver

    Sgcarmart Explores: 2026 National Day Edition!

    Sgcarmart Explores: 2026 National Day Edition!

    Dunlop's new tyres for an electrified world

    Dunlop's new tyres for an electrified world

    Corvette Stingray Review

    Corvette Stingray Review

    Omoda & Jaecoo is forging ahead with its Super AI cockpit

    Omoda & Jaecoo is forging ahead with its Super AI cockpit

    A first look at the Sitrak Light eTruck!

    A first look at the Sitrak Light eTruck!

    The new Pirelli Cinturato Rosso with Seal Inside Tech!

    The new Pirelli Cinturato Rosso with Seal Inside Tech!

    Related Articles

    LTA's CRL3 will connect Jurong Lake District to Gul Circle

    LTA's CRL3 will connect Jurong Lake District to Gul Circle

    Lamborghini gives the Temerario the bespoke treatment

    Lamborghini gives the Temerario the bespoke treatment

    LTA may consider merging Cat A and B COEs in the future

    LTA may consider merging Cat A and B COEs in the future

    COE supply up 0.2% for upcoming quarter

    COE supply up 0.2% for upcoming quarter

    LTA to host special public preview of three new stations

    LTA to host special public preview of three new stations

    LTA gives update for Malaysia-registered taxis entering SG

    LTA gives update for Malaysia-registered taxis entering SG

    LTA awards 2nd civil contract for Changi Southern Corridor

    LTA awards 2nd civil contract for Changi Southern Corridor

    ERP rates to rise come end of June

    ERP rates to rise come end of June

    Related Articles

    LTA's CRL3 will connect Jurong Lake District to Gul Circle

    LTA's CRL3 will connect Jurong Lake District to Gul Circle

    Lamborghini gives the Temerario the bespoke treatment

    Lamborghini gives the Temerario the bespoke treatment

    LTA may consider merging Cat A and B COEs in the future

    LTA may consider merging Cat A and B COEs in the future

    COE supply up 0.2% for upcoming quarter

    COE supply up 0.2% for upcoming quarter

    LTA to host special public preview of three new stations

    LTA to host special public preview of three new stations

    LTA gives update for Malaysia-registered taxis entering SG

    LTA gives update for Malaysia-registered taxis entering SG

    LTA awards 2nd civil contract for Changi Southern Corridor

    LTA awards 2nd civil contract for Changi Southern Corridor

    ERP rates to rise come end of June

    ERP rates to rise come end of June