View page in desktop
|
Report error
  •   Apple app store icon
  • Google play store icon
Terms of Service
|
Privacy Policy
|
PDPA
|
Site Map
©2004-2026 Sgcarmart, Singapore. All rights reserved.
  • Home
  • Car Articles
  • news
  • news Listings
  • MRT News
  • SMRT to hire 40 percent more rail engineers

    23 Oct 2017

    |

    1,159 views

    SMRT has announced that it plans to hire 40 percent more rail engineers by 2020 and set up readiness inspection teams to audit maintenance works.


    SMRT has set a target of hiring 40 percent more rail engineers by 2020, beefing up the total number to 700 from the current 500. It will also set up readiness inspection teams, which will report independently to an audit and risk committee, to audit maintenance works. The teams will serve as an additional layer of checks and balances. These measures to boost MRT reliability were announced by SMRT Chairman Seah Moon Ming on Monday (23rd October).

    "We have a long road ahead of us as we drive towards rail excellence. We must win back the public's trust and confidence in SMRT," said Mr. Seah in a speech, his first public remarks since last week's press conference to address a tunnel flooding incident earlier this month.

    "This is why we need engineers with a high level of competence, applied courageously and leveraged through the right connections," he added. Mr. Seah was speaking at the Nanyang Technological University at One-North, to some 250 SMRT engineers who are attending a postgraduate certificate course jointly run by SMRT and the University of Birmingham.

    Mr. Seah said that even as SMRT works with the Land Transport Authority to upgrade older rail lines and to improve maintenance, engineering expertise will also be called upon to build resilience in the network with more 'fail-safe' and 'fail-soft' features. This means that even when the rail system breaks down, it fails in a safe manner, and it does not fail totally, with backups in place, he said.

    SMRT will also require more engineers in the lead up to the opening of the Thomson-East Coast Line, which opens from 2019, and which it won a contract to operate.
    24.4k

    Tags

    mrt smrt smrt rail engineers mrt delay mrt breakdown smrt audit team smrt maintenance audit

    AllReviewsNewsAdviceFeaturesVideos
    • Home
    • Car Articles
    • news
    • news Listings
    • MRT News

    SMRT to hire 40 percent more rail engineers

    23 Oct 2017

    |

    1,159 views

    SMRT has announced that it plans to hire 40 percent more rail engineers by 2020 and set up readiness inspection teams to audit maintenance works.


    SMRT has set a target of hiring 40 percent more rail engineers by 2020, beefing up the total number to 700 from the current 500. It will also set up readiness inspection teams, which will report independently to an audit and risk committee, to audit maintenance works. The teams will serve as an additional layer of checks and balances. These measures to boost MRT reliability were announced by SMRT Chairman Seah Moon Ming on Monday (23rd October).

    "We have a long road ahead of us as we drive towards rail excellence. We must win back the public's trust and confidence in SMRT," said Mr. Seah in a speech, his first public remarks since last week's press conference to address a tunnel flooding incident earlier this month.

    "This is why we need engineers with a high level of competence, applied courageously and leveraged through the right connections," he added. Mr. Seah was speaking at the Nanyang Technological University at One-North, to some 250 SMRT engineers who are attending a postgraduate certificate course jointly run by SMRT and the University of Birmingham.

    Mr. Seah said that even as SMRT works with the Land Transport Authority to upgrade older rail lines and to improve maintenance, engineering expertise will also be called upon to build resilience in the network with more 'fail-safe' and 'fail-soft' features. This means that even when the rail system breaks down, it fails in a safe manner, and it does not fail totally, with backups in place, he said.

    SMRT will also require more engineers in the lead up to the opening of the Thomson-East Coast Line, which opens from 2019, and which it won a contract to operate.
    24.4k

    Tags

    mrt smrt smrt rail engineers mrt delay mrt breakdown smrt audit team smrt maintenance audit

    Newsletter

    Be Notified On The Latest News

    Newsletter

    Be Notified On The Latest News

    Latest COE Prices

    August 2026 | 1st BIDDING
    NEXT TENDER: 19 Aug 2026
    CAT A
    $123,890
    CAT B
    $129,910
    CAT C
    $91,545
    CAT E
    $131,000
    View Full Results

    Latest COE Prices

    August 2026 | 1st BIDDING
    NEXT TENDER: 19 Aug 2026
    CAT A
    $123,890
    CAT B
    $129,910
    CAT C
    $91,545
    CAT E
    $131,000
    View Full Results

    Related Articles

    New to driving? Here's how to become a better driver

    New to driving? Here's how to become a better driver

    Sgcarmart Explores: East Coast Park!

    Sgcarmart Explores: East Coast Park!

    Subaru Forester e-Boxer Hybrid 2.5 Review

    Subaru Forester e-Boxer Hybrid 2.5 Review

    The 5 main things you must know about the XPENG L03

    The 5 main things you must know about the XPENG L03

    Honda ZR-V Hybrid Review

    Honda ZR-V Hybrid Review

    New cars are safer: Opt for one when you can

    New cars are safer: Opt for one when you can

    IM5 Electric Luxury Review

    IM5 Electric Luxury Review

    ORA 5 Review

    ORA 5 Review

    Related Articles

    New to driving? Here's how to become a better driver

    New to driving? Here's how to become a better driver

    Sgcarmart Explores: East Coast Park!

    Sgcarmart Explores: East Coast Park!

    Subaru Forester e-Boxer Hybrid 2.5 Review

    Subaru Forester e-Boxer Hybrid 2.5 Review

    The 5 main things you must know about the XPENG L03

    The 5 main things you must know about the XPENG L03

    Honda ZR-V Hybrid Review

    Honda ZR-V Hybrid Review

    New cars are safer: Opt for one when you can

    New cars are safer: Opt for one when you can

    IM5 Electric Luxury Review

    IM5 Electric Luxury Review

    ORA 5 Review

    ORA 5 Review

    You May Also Like

    Get your next rental from AKA Car Rental

    Get your next rental from AKA Car Rental

    New to driving? Here's how to become a better driver

    New to driving? Here's how to become a better driver

    Sgcarmart Explores: 2026 National Day Edition!

    Sgcarmart Explores: 2026 National Day Edition!

    Dunlop's new tyres for an electrified world

    Dunlop's new tyres for an electrified world

    Corvette Stingray Review

    Corvette Stingray Review

    Omoda & Jaecoo is forging ahead with its Super AI cockpit

    Omoda & Jaecoo is forging ahead with its Super AI cockpit

    A first look at the Sitrak Light eTruck!

    A first look at the Sitrak Light eTruck!

    The new Pirelli Cinturato Rosso with Seal Inside Tech!

    The new Pirelli Cinturato Rosso with Seal Inside Tech!

    You May Also Like

    Get your next rental from AKA Car Rental

    Get your next rental from AKA Car Rental

    New to driving? Here's how to become a better driver

    New to driving? Here's how to become a better driver

    Sgcarmart Explores: 2026 National Day Edition!

    Sgcarmart Explores: 2026 National Day Edition!

    Dunlop's new tyres for an electrified world

    Dunlop's new tyres for an electrified world

    Corvette Stingray Review

    Corvette Stingray Review

    Omoda & Jaecoo is forging ahead with its Super AI cockpit

    Omoda & Jaecoo is forging ahead with its Super AI cockpit

    A first look at the Sitrak Light eTruck!

    A first look at the Sitrak Light eTruck!

    The new Pirelli Cinturato Rosso with Seal Inside Tech!

    The new Pirelli Cinturato Rosso with Seal Inside Tech!