With Phase One of LTA's P2P review commencing on 1 January 2025, Phase Two will begin in March 2025, with LTA tackling issues the P2P industry faces.
Of the six stations announced under Phase 2, King Albert Park and Clementi are first to welcome Cross Island Line interchanges.
Volvo has announced that it will phase out production of diesel-powered cars by early 2024 at Climate Week NYC.
The trains will be similar to those on the Thomson-East Coast Line, but boast wider gangways for improved accessibility.
Comprising 12 stations and spanning 29km, this phase of the construction will link vital stations today, including Hougang, Pasir Ris and Ang Mo Kio.
The LTA has announced that a total of 11 MRT stations will open for passengers service along TEL Phase 3 come 13 November 2022.
The LTA has revealed the locations of the six stations that will comprise Phase 2 of the Cross Island Line, set to open come 2032.
The Land Transport Authority has handed over the stations of phase 3 of the Thomson-East Coast Line to SMRT to begin preparations for commuter service.
The Rolls-Royce Spectre has been extensively developed by the manufacturer, going through extreme conditions of Arjeplog, Sweden to the current French Riviera.
Carsharing with Tribecar keeps us safe as we head out for our errands, even as stricter social distancing measures kick in.
The ride-hailing platform states that the entirety of the fare hike will go towards raising the earnings of its driver-partners.
ERP rates back down in lieu of the implementation of Phase 2 (Heightened Alert) measures and full Home-Based Learning.
Ride-hailing passengers using the Grab platform will no longer travel in old cars by July 2022, as the firm moves in response to new industry regulations.
Porsche Centre Singapore rolls out two new initiatives - unaccompanied test drives and contactless servicing, both now available for booking.
With traffic speeds on expressways and arterial roads remaining optimal through June, the LTA has decided to continue the suspension of ERP charges.
Demand for taxi and private-hire services remains low as Singapore enters phase 2 of its reopening, while public transport ridership is expected to rise.
Commuters and drivers will be able to tap Grab's GrabHitch service from 22 June 2020, but the ride-sharing service GrabShare, will remain suspended.
Commuters can expect regular train and bus service frequencies starting from 2 June 2020 as circuit breaker measures are lifted.
The LTA has announced that motorists will continue to avoid paying Electronic Road Pricing charges at all gantries until at least June 28 2020.
With demand for taxis expected to recover, taxi drivers for ComfortDelGro will pay half the usual rental rates for the month of June.